← Help Centre

Methodology

Value stream mapping theory and lean principles.

What is value stream mapping?

A one-page explanation of value stream mapping - what it is, where it came from, and what it's actually good for.

60 views

The 8 wastes (TIMWOODS)

The eight categories of waste in Lean - Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, Skills.

59 views

Cycle time vs wait time

The distinction that makes value stream mapping useful - and why wait time usually dwarfs cycle time.

53 views

Takt time

Takt is the beat of customer demand. Every stage that's slower is a bottleneck; every stage that's faster is over-producing.

67 views

Process Cycle Efficiency (PCE) explained

PCE tells you what proportion of your lead time is actually value-adding. If it's below 10% you have a flow problem.

56 views

Lead time, cycle time, and throughput

Three related but distinct measures. Confusing them is one of the most common VSM mistakes.

37 views

Building a current-state map

The current-state map is the honest picture of how the process runs today. Get this right or the rest is useless.

33 views

Building a future-state map

Future-state maps are hypotheses. They need to be specific, sequenced, and testable.

33 views

Value-Add, Non-Value-Add, and Incidental work

A three-way classification is more useful than a binary VA/NVA split. Learn where incidental work fits.

33 views

Standard work

Standard work is the current best-known way to do a task. Not a straitjacket - a baseline for improvement.

34 views

The Gemba walk

Go and see. The single most important habit in Lean, and the one most often faked from a conference room.

38 views

5S - workplace organisation

Sort, Set in Order, Shine, Standardise, Sustain. Boring, unglamorous, and the foundation of every good Lean transformation.

32 views

Root cause analysis basics

Symptoms are easy to spot. Root causes take discipline. Two techniques that reliably get you there.

35 views

The 5 Whys

The simplest root-cause tool. Ask why. Then ask why to the answer. Repeat until you can't.

31 views

Running a kaizen event

A kaizen event is a focused, time-boxed improvement effort. Done well, it moves a process in days that would otherwise take months.

31 views

DMAIC problem-solving framework

Define, Measure, Analyse, Improve, Control - the classic Six Sigma problem-solving cycle.

28 views

OEE - Overall Equipment Effectiveness

OEE is the standard measure of how well a station or line is performing against its potential. Availability x Performance x Quality.

31 views

SMED - Single-Minute Exchange of Die

Shigeo Shingo's technique for reducing changeover time - typically by 50-90% - without buying new equipment.

31 views

Kanban systems

Visual signals that trigger work. The mechanism that makes pull production work in practice.

30 views

Line balancing

Distribute work across stations so each takes roughly the same time. The prerequisite for smooth flow.

31 views

Bottleneck analysis

The Theory of Constraints in one page. Find the constraint, exploit it, subordinate everything else to it, elevate it, repeat.

30 views

Spaghetti diagrams

Draw the actual path an operator or work item takes through a space. You'll be shocked.

31 views

A3 problem-solving

Distill a whole problem-solving effort onto one A3 page. Forced brevity is the discipline.

30 views

Process capability

How well does your process meet spec? Cp, Cpk, and why they're not the same thing.

29 views

PDCA - Plan, Do, Check, Act

Deming's improvement cycle. The mental model behind almost every Lean and quality practice.

29 views